Request a Quote

OCPP Protocol & Charger Integration

Published June 14, 2022
why ocpp
Skip to OCPP guide

EV CHARGING TECHNOLOGY

OCPP Protocol for Commercial EV Charging

Connect charging stations with a charging station management system (CSMS). EV-TOP supports OCPP 1.6J, with compatibility and required functions reviewed for your charger model, firmware and backend.

Share your platform and project requirements so we can define the device communication and integration scope.

Need OCPP 2.0.1? Model eligibility, timing and upgrade conditions require separate confirmation.

How OCPP connects a charger to a backend

OCPP stands for Open Charge Point Protocol. It defines communication between a charging station and a central management system. The charger and backend exchange messages to support charging operations.

Charging station
OCPP messages
Charging station
management system (CSMS)
Communication overview. Available functions depend on the charger and backend implementation.

The charging station

Runs the charging session and exchanges supported status, transaction and meter data with the backend.

The management system

Handles the agreed monitoring and operating workflows. Accounts, tariffs, billing and service availability depend on the platform and service agreement.

Vehicle and site systems

Vehicle communication and site energy control have their own requirements. Plug & Charge and local load management need separate checks alongside the OCPP connection.

Choose the version your project requires

Confirm the protocol version on both sides of the connection before selecting a charger or planning an upgrade.

OCPP versions: protocol context and EV-TOP project position
VersionProtocol contextEV-TOP project position
OCPP 1.6JThe JSON implementation of OCPP 1.6 for charger-to-backend communication.Current supported version. Confirm the model, firmware and functions for your project.
OCPP 2.0.1Adds capabilities such as device management, enhanced security and ISO 15118 support.An upgrade direction, subject to confirmation of the model, timing and conditions.
OCPP 2.1Extends the standard with additional energy and charging functions.Reference information only. This page does not offer an EV-TOP OCPP 2.1 configuration.

OCPP 1.6 and OCPP 2.0.1 are not directly compatible. A migration needs an agreed charger, firmware and backend plan.

Read the OCA protocol overview

Technical content reviewed: 16 November 2026

Check the functions your deployment needs

Use this checklist to define your integration scope. It is a list of items to review and test, not a claim that every model includes every function.

OCPP integration review and test evidence
Review areaAgree before testingEvidence to record
Connection and securityProtocol version, station identity, network access and the backend’s connection and security requirements.Connection result and the approved configuration.
Authorization and sessionsRequired access methods, remote commands and transaction start/stop behaviour.Agreed scenarios and charger/backend logs.
Meter and status dataRequired data fields, units, timestamps and reporting intervals.Matched records from the charger and backend.
Connection loss and recoveryBehaviour during a network interruption, reconnection, queued records and reconciliation.Recovery tests and any remaining limitations.
Charging controlRequired charging profiles, site limits and priority between backend and local controls.Test results for the agreed site scenarios.
Diagnostics and updatesLog access, remote maintenance and firmware update or recovery procedures.Confirmed support scope and test outcomes.

Plan the integration before deployment

  1. Share the project

    Provide the installation country, charger type or model, quantity, target CSMS and required functions.

  2. Agree the scope

    Confirm the hardware and firmware configuration, platform requirements, test environment and responsibilities.

  3. Test the agreed scenarios

    Coordinate the charger and backend tests. Record the results, limitations and any actions needed before acceptance.

  4. Confirm the deployment plan

    Agree the configuration to be supplied, site commissioning steps and support arrangements. Custom firmware or platform work needs its own schedule.

Know who owns each part

Integration responsibilities
PartyResponsibility
EV-TOPDevice communication compatibility review and basic connection and debugging within the agreed scope.
Customer or CSMS providerPlatform accounts, operations, service availability and the agreed platform SLA.
Local project teamSite installation, network and electrical readiness, permits, grid connection and site acceptance, as allocated in the project contract.

For a German project, review the applicable metering, billing and grid-control requirements with your local project team. An OCPP connection does not establish site compliance.

Find the right technical information

OCPP specifications

Use the Open Charge Alliance’s published information to understand the protocol versions and available specifications.

Explore OCA specifications

Charger integration information

Request the configuration and technical information relevant to your selected model and project. Document availability and scope are confirmed during the review.

Request Integration Information

OCPP FAQ

OCPP questions for your project

What does OCPP stand for, and what does 1.6J mean?

OCPP stands for Open Charge Point Protocol. It defines communication between a charging station and a central management system. The J in OCPP 1.6J identifies the JSON implementation of version 1.6.

Which OCPP version does EV-TOP support?

EV-TOP’s current supported version is OCPP 1.6J. The model, firmware and required functions are confirmed for each project. OCPP 2.0.1 is an upgrade direction with model eligibility, timing and conditions subject to separate confirmation.

Will an EV-TOP charger work with my charging platform?

EV-TOP supports third-party CSMS integration. Share your target platform, charger requirements and required functions so we can assess the connection and test scope. Matching version labels alone do not confirm all project functions.

Is OCPP support the same as OCPP certification?

No. Protocol support and independent certification are different claims. If certification is required for your project, request the applicable certificate and check its product, software version and scope.

Does OCPP provide dynamic load balancing?

OCPP includes smart charging capabilities, but the required charging profiles and control behaviour must be supported by the charger and backend. Local load controllers, metering and control priorities also need to be checked for the site.

What happens if the internet connection is lost?

Offline authorization, ongoing charging, data storage and recovery depend on the model, firmware and configuration. Define the required behaviour and test network loss and reconnection before deployment.

Does OCPP mean Plug & Charge is available?

No. OCPP handles charger-to-backend communication. Plug & Charge involves vehicle and charger support, certificate handling and the relevant backend services. Confirm the complete combination for your project.

Does an OCPP connection make a charger compliant for Germany?

No. OCPP communication is only one part of the project. Review the applicable metering, billing, electrical and grid-control requirements for the selected equipment and installation with your local project team.

YOUR OCPP PROJECT

Tell us what your charger needs to connect to

Start with your country, charger type or model, quantity, target CSMS and main integration requirement. A short summary is enough for the first enquiry.

Example project summary

Germany; 20 AC chargers; existing CSMS; need OCPP 1.6J and charging control.

Discuss Your OCPP Integration

We review the device communication scope. Platform operation and any custom development are agreed separately.

Please leave passwords, private keys and detailed technical logs out of the enquiry form. Share these only through an agreed technical channel when needed.

Plan your EV charging project

Tell us your site, power supply and charging needs. We’ll help you review suitable EV-TOP options.

Request a Quote