For employers, property teams and installers

Workplace
EV Charging

Plan EV charging for employees who park for the working day, with additional options for visitors and company vehicles. EV-TOP supplies charging hardware and technical support for your project.

Your local installation team handles site works, electrical approvals and commissioning.

EV-TOP wall-mounted charger connected to an electric car
Workplace charging illustration.
  • Employee parking
  • Shared office sites
  • Company vehicles

Start with how your car park is used

The right number of charging points depends on who uses the site, how long vehicles stay and how much energy they need before leaving. Start with current demand, then plan space and electrical routes for future expansion.

Employees staying for the working day

Use longer parking periods to spread charging demand. Record typical arrival and departure times, daily energy needs and how many vehicles need to charge at the same time.

Visitors and shared parking

Match charging to the visit length. Longer meetings may suit AC charging; shorter stays may justify a separate DC option after reviewing vehicle compatibility and site power.

Company cars and pool vehicles

Check when each vehicle must leave and the energy it needs for the next trip. Keep operational requirements separate from optional employee charging.

Four inputs for the first review

  • Current EV users and expected growth
  • Typical parking time and departure needs
  • Available charging bays and cable routes
  • Site power information and existing chargers

You can start with estimates. Your installer can help confirm the electrical details.

Review site power and expansion

Choose AC for longer stays. Add DC where time matters.

For vehicles parked for several hours, AC charging is a practical starting point. Select the output to match the vehicle’s onboard charger and the power available at the site. Consider DC when the available parking time is too short for the required energy.

Type 2 configurations

71122kW
Display
4.3-inch LCD
Enclosure
IP55 enclosure rating
Mounting
Wall-mounted AC

Electri Charge A23

A wall-mounted AC option to discuss for employee parking and shared office sites.

OCPP 1.6J is listed for the Type 2 configuration. Confirm the selected model, access options, firmware and backend connection before ordering.

Actual charging power is limited by the vehicle, electrical supply and site control settings.

Two charging positions

If two adjacent bays need charging, ask about a dual-output AC configuration. Confirm output per vehicle, total supply requirements and the management options for the selected model.

Discuss Dual-Output AC

Shorter stops and operational vehicles

Compact DC may suit vehicles that need more energy during a shorter stop. EV-TOP’s Compact DC category covers 20–80 kW; the available connector and output depend on the selected model.

Discuss a DC Option

Plan charging around available site power

Charging shares electrical capacity with the rest of the building. A load-management design can allocate the available charging power as other site loads change. It does not create extra grid capacity, and some sites will still need electrical upgrades.

Check the control path

Share the charger models, firmware, meters and management platform already on site. An OCPP connection alone does not confirm that every load-management function or third-party controller will work.

Leave room for the next phase

Review cable routes, distribution equipment, communications and space for additional bays with your installer. Agree how future chargers will be added to the same site power limit.

Power distribution
Site supply
Building loads
EV charging
Measurement & control
  1. Site measurement
  2. Compatible controller
    or management platform
  3. Supported chargers
Concept only. Metering, control paths and equipment compatibility are defined for each project.
  • Available site capacity
  • Building demand profile
  • Existing charger and meter models
  • Required charging priorities
  • Behaviour if communications are lost
Review My Site Requirements

Set clear rules for employees, visitors and company vehicles

Decide who can charge, when they can use the bays and who pays for each session. Then confirm that the selected charger configuration and management platform can support those rules.

Planning access and charging policies
User groupDecide before configurationConfirm with the platform provider
EmployeesFree or paid charging, access hours and rules for moving a charged vehicleUser access, session records and any charging fees
VisitorsWho may use the bays and whether access is restricted or open to the publicGuest access and any applicable payment process
Company vehiclesRequired departure times, cost allocation and operational prioritiesVehicle or driver records, reporting and supported priority controls

Use the backend that fits your operation

EV-TOP supports third-party CSMS integration, subject to compatibility checks for the selected hardware, firmware and platform. Accounts, tariffs, invoicing, reservations and ongoing platform services are provided by the chosen operator or software provider.

Discuss Access and Billing

Build a budget and a delivery plan

A workplace charging budget includes more than the chargers. Separate equipment supply, local installation and ongoing operation so that each part of the project has a clear owner.

Planning equipment, installation and operation costs
Budget itemWhat to includeWho confirms the scope
Charging equipmentCharger configuration, mounting accessories, required controllers and meters, shipping termsEV-TOP and the purchasing team
Site works and electrical installationCable routes, distribution equipment, civil works, grid coordination and commissioningYour local contractor or installer
Software and operationConnectivity, platform fees, access policies, billing and site maintenanceYour platform provider and site operator

From requirements to equipment supply

  1. Share the site brief

    Tell us the location, user groups, parking pattern, target quantities and any known power limits.

  2. Review the configuration

    Confirm charger models, interfaces, control requirements and the documents needed by your local team.

  3. Confirm the equipment quotation

    Agree the final configuration, order quantity, delivery terms and any approved sample or integration tests.

  4. Prepare for local installation

    EV-TOP supplies the agreed equipment and technical documents. Your local team completes site installation, approvals and commissioning.

EV-TOP provides installation documentation, spare-parts support and 5×8 remote technical support. On-site work, ongoing platform services and any enhanced service commitments are agreed separately.

Request Project Documents

Workplace charging questions

Is AC or DC charging better for a workplace?

AC is a practical starting point when vehicles stay for several hours. DC may be useful for shorter visits or company vehicles with tighter turnaround times. Choose based on required energy, parking time, vehicle capability and available site power.

How many charging points do we need?

Start with the number of vehicles that need to charge at the same time, rather than the total number of employees. Review parking patterns, daily energy needs and expected growth with your installer. The number of charging points and the number of charger units may differ when dual-output equipment is used.

Will a 22 kW AC charger charge every car at 22 kW?

No. AC charging is also limited by the vehicle's onboard charger, the electrical supply and any site power limits. Confirm vehicle capability before selecting a higher output.

Can load management avoid a grid upgrade?

It can help allocate the capacity already available to charging, but it cannot guarantee that an upgrade will be unnecessary. Your local electrical team should review the site's demand, supply capacity and required charging service.

Can we connect to our existing charging platform?

EV-TOP supports third-party CSMS integration. Compatibility must be checked for the selected charger, firmware, OCPP functions and platform. Existing chargers and third-party load controllers also need a separate compatibility review.

Can employees charge for free while visitors pay?

That can be a policy to plan for, but it must be supported by the selected access and billing system. Confirm user groups, tariffs and payment requirements with the platform provider. For projects in Germany, review the complete metering and billing arrangement before offering paid charging.

Do employees have to use an app?

Access methods depend on the chosen charger configuration and backend. Ask us to review your preferred approach, such as RFID access or an app. Existing staff badges are not automatically compatible.

Does EV-TOP install the chargers?

EV-TOP supplies equipment, technical documents and remote support. Local contractors or installers handle site works, permits, electrical connections and commissioning unless a separate project agreement states otherwise.

What are the order quantity and lead-time requirements?

The standard MOQ for bulk orders is 100 units. Paid samples and project exceptions require approval. Standard hardware production is typically about one month after the purchase order, deposit and final configuration are confirmed. Shipping, site works and software customisation have separate schedules.

What warranty and support are included?

The standard warranty is 24 months from shipment or the bill-of-lading date. After remote diagnosis confirms a product quality issue, EV-TOP provides the applicable warranty spare parts. On-site labour, removal, reinstallation and logistics follow the contract terms. Standard technical support is remote, 5×8.

Tell us about your workplace car park

Share your site location, expected EV users, typical parking time and any power information you already have. We can discuss the equipment configuration and the documents your local installation team needs.

  • Site country and city
  • Employees, visitors or company vehicles
  • Initial charging points and future plans
  • Known power limits or existing chargers
Discuss Your Workplace Project

Estimates are welcome if your project is still at an early stage.