Power Hub / Split-system architecture

Split-System
DC Charging

Centralized power conversion with separate charging terminals. Plan a Power Hub system around your site capacity, charging bays and expansion needs.

Concept illustration of a central power cabinet beside multiple EV charging bays

01 / System architecture

Power conversion and charging terminals, separated

Review the hub, terminal layout and output allocation together. Each defines a different part of the charging system.

Power Hub / System architecture

Site electrical supplyAvailable capacity and protection
Power HubCentralized power conversion & distribution
Charging terminalAt the parking bay
Charging terminalAt the parking bay
Conceptual architecture. The symbols do not specify terminal count, simultaneous sessions or power per vehicle.
01 / CENTRAL POWER

Power Hub

Houses the centralized power conversion equipment. Confirm cabinet rating, supported modules and distribution arrangement for the selected model.

02 / CHARGING BAYS

Charging terminals

Provide the connection to vehicles at the parking bays. Confirm terminal compatibility, connectors, cable reach and mounting requirements.

03 / OUTPUT ALLOCATION

Concurrent charging

Review power allocation across active terminals. Total hub power, connected terminal count and simultaneous output are separate specifications.

02 / Power Hub range

Plan your Power Hub configuration

Match the power cabinet and charging dispensers to your site. Request model-specific output and compatibility details before selection.

Split DC charging system with a central cabinet and separate dual-connector dispenser
EV-TOP / Power Hub

Power cabinet + charging dispensers

Specify the system around your available supply, vehicle mix and operating plan. Cabinet capacity and terminal output are confirmed for the selected configuration.

Site supply

Available electrical capacity and connection requirements.

Charging bays

Planned bays and required simultaneous sessions.

Vehicle demand

Vehicle types, charging windows and connector needs.

Operating setup

Backend, access, metering and payment requirements.

Custom system requirements

Share your target power and terminal layout. Available scope, expansion limits and custom requirements are subject to engineering review.

Discuss Customization

A cabinet rating does not guarantee the same output at every dispenser at the same time. Confirm the cabinet, dispenser and connector limits in the approved technical data sheet.

03 / Expansion planning

Plan the first phase and future capacity

Define the upgrade path before selecting the initial system. Expansion depends on the cabinet, compatible equipment and site infrastructure.

01 / INITIAL DEMAND

Size the first phase

Provide available site power, daily energy demand, dwell time and required simultaneous charging sessions.

02 / FUTURE LAYOUT

Reserve installation space

Review cabinet space, cable routes, distribution and future bays with your installation team.

03 / UPGRADE BOUNDARY

Confirm compatible additions

Request the approved module and terminal expansion path, including shutdown requirements and any infrastructure changes.

04 / Project applications

Review your site’s charging requirements

Start with vehicle demand and site constraints to assess whether a split system is suitable.

01 / CPOs

Public charging hubs

Review peak demand, bay turnover, simultaneous charging and backend integration requirements.

Discuss This Application ↗

02 / FLEET OPERATORS

Bus & truck depots

Share route schedules, vehicle specifications, overnight windows and charging energy requirements.

Discuss This Application ↗

03 / SITE DEVELOPERS

Phased charging sites

Define the initial number of bays, future demand and available supply for each development phase.

Discuss This Application ↗

05 / Technical documentation

Confirm the system before ordering

Request documents for the selected hub, terminal configuration and target market.

Model & output specifications

Exact model code, rated output, voltage and current range, compatible terminals and concurrent-output allocation.

Installation & expansion

Cabinet dimensions, electrical requirements, cable limits, site layout and permitted upgrade path.

Integration & market requirements

Confirm backend compatibility, supported interfaces and certification documents applicable to your configuration.

06 / Questions before selection

Split-system charging FAQs

What is a split system DC charger?

A split system separates centralized power conversion from the charging terminals at the parking bays. The Power Hub and compatible terminals form the charging system. The diagram shows this relationship; it is not an installation drawing.

How do I choose a Power Hub configuration?

Share your available supply, charging bays, vehicle requirements and operating plan. Request the approved cabinet model, output range and compatible dispensers for your project.

How many vehicles can charge at the same time?

The maximum connected terminals and maximum simultaneous charging sessions must be confirmed for the selected configuration. They must be confirmed separately for the selected hub and terminal configuration. The hub rating does not describe power available to every vehicle simultaneously.

Can I add terminals or power later?

Expansion must be planned around the selected cabinet, supported modules, distribution, cable routes and site supply. Ask for the permitted upgrade path before ordering. A product family range does not establish the upgrade path of an individual cabinet.

Can the system be customized?

Share your required power, terminal layout, connector needs, target market and branding requirements. Available scope, upper power limit, engineering changes and certification impact require a project review.

Which documents should I request?

Ask for the exact model datasheet, terminal compatibility list, simultaneous-output allocation, installation requirements and applicable market documentation. Published downloads will be added when approved files are available.